Building of 13 houses, garage, storage room and community pool.
Avenue Alcoy, 63. 03560 El Campello (Alicante)
Desde 2 Habitaciones y 2 Baños desde 155.000€
Desde 3 Habitaciones y 2 Baños desde 180.000€
3000€ de reserva
10% firma de contrato de arras en 2023
20% antes de la entrega de la vivienda, segundo trimestre 2025
Resto en escritura publica de compraventa
STRUCTURE
Made of reinforced concrete, waffle slab.
TILED
Top quality ceramic tiling in bathrooms.
PAVEMENTS
Synthetic laminate flooring or porcelain stoneware, stoneware moisture areas.
In hallway, portal and staircase, gray granite or similar (depending on the direction of the work), partition, footprint and zanquin.
LUCKY
Exteriors with monolayer, and PVC corner pieces on edges.
ESCAYOLAS
Removable with moldings in bathrooms
CARPENTRY
EXTERIOR: PVC windows and balcony doors. Bicolor (Anthracite exterior and White interior)
INTERIOR: White lacquered single-leaf folding doors and chrome hardware. The entrance door to the armored house.
KITCHENS
Kitchen furniture with high and low elements. Bench, with multicolored granite or Compac (depending on construction management)
Single undermount sink.
PLUMBING
For hot and cold water with cross-linked polyethylene tube, all in accordance with current regulations.
SANITARY EQUIPMENTS
Shower tray, sink and toilet.
TAPS
Chrome mixer throughout the house.
ELECTRICITY
Electrification level B = 5,000W., With 4 circuits.
DARKNESSES
Aluminum blinds, with built-in dustpan, in bedrooms.
FACADE
Facing brick and single-layer plaster on ceilings
GLASS
Climalit Plus double glazing in the exterior carpentry of the facade.
PAINTING
On interior vertical and horizontal walls, with two plastic coats, finished in off-white.
COVERS
Slope with insulating material, asphalt fabric and non-slip stoneware.
URBANIZATION
Community rooftop pool
SPECIAL FACILITIES
Three antenna sockets per home.
Three telephone and UTP points per home.
Installed air conditioning ducts
GEN2 OTIS elevator.
Video intercom.
110 liter air heater.
NOTE: The materials and facilities included in this report may be modified by the project manager architect, replacing them with others of equal or higher quality.